Nigeria Energy Systems Integrators
Providing professional energy service to meet your need by integrating your energy systems to save you money while improving the environment.
High Cost of Kits
Conversion kits can be expensive and outside the reach of average Nigerian. This is because they have to be imported and require special fuel storage tanks and other equipment to use CNG fuel.
ZTEN, envisage cost to gradually get lower as we start production of some of the components and more people convert their vehicles and generators to run on CNG
Safety Concerns
CNG is flammable gas and could be highly explosive when handle wrongly.
This is why ZTEN, promote training to high-level and Certification at the Obafemi Awolowo University, Ile-Ife. Osun State.
We also provide on-site for those unable to travel to the University due to distance etc.
We now have regulations in place to ensure that the conversion is sound and CNG refuelling stations are safe for use.
Fuelling Infrastructure
Limited refuelling infrastructure is a major concern in Nigeria. This is because it is capital intensive for Station Operators on one hand and health and safety on the other. Presently, majority of Nigeria refuelling stations are in high populated density towns and cities. Nigeria maintenance culture need revamping to site CNG within high populated density areas.
ZTEN, is the only Nigerian refuelling sighting their Station outside populated areas, on Motorways e.g. Lagos – Ibadan Express Road, Ibadan – Ile-Ife – Ilesha – Akure – Ado Ekiti etc.
Another disadvantage is lack of local pipeline network. ZTEN, provide campus solution e.g., within an Estate Manage environment. Local resident can benefit from using CNG as cooking fuel
.
Distance Cover
Begin a Compressed Gas, the flow of gas to the engine is governed be the pressure in the tank. When compared to LNG or LPG, which are liquid and pumped like petrol into the engine, they carry more energy punch than CNG, and you could cover more kilometre than equivalent CNG but are more expensive.
In the case of LPG, it is not as environmentally friendlier as CNG and LNG. Whereas ZTEN is pushing for N45.00 per litre equivalent for CNG, LPG is much more expensive.
We consult on most matter of energy, from supply of Crude Oil, Natural Gas (CNG and LNG), Hydrogen, Geothermal, Solar, Wind, Bio-Gas and Nuclear, from Planning, development to commissioning.
In Nigeria we are rolling out CNG Filling Stations
We speak Energy language.
Exploration to Production
We provide guarantee and regular NG supply to fixed facilities. NG is discharge according to highest safety Standards and conditions set out under our Health and Safety Conditions.
We provide trained staff on fuel management & safety on your premises and we Certify such operation to meet the Standard set by the Nigeria Fire Regulation and European Union Standards.
Vehicle conversion
It takes approximately 4 to 6 hours to install a vehicle conversion kit without unanticipated complications. You can book online from any of the approved/certified installer list conversion@ztenig.com. This gives you time to ensure all necessary components are in stock for your vehicle make and model.
Engagement Contract
We work with our clients to design and build bespoke CNG and LNG refuelling facilities. We offer private facilities or publicly accessible refuelling stations in strategic locations
Contract
Our own gas-powered tankers deliver LNG direct to stations when customers need it. We also supply CNG by grid connection or by tanker (known as L-CNG) where a grid connection is not available
CURRENCIES
Engagement Contract
We run the station from the start. From build, upgrades to maintenance to expansions - our expert team of engineers do it all, 24 hours a day. Our stations are operated and maintained
We like to know your need exactly so that we can provide the perfect solution. Let us know what you want and we’ll do our best to help. WhatsApp us